Today we (Maurizio and I) installed most of the components of the CH telescope on the WI bench. We carefully re-aligned the CO2 beam on the AXICON and on the crosshair. The WI TCS is fully operational.
Since the beam dumps are not yet watered, they were becoming too hot, because circa 3W are being dissipated on them. So we decided to intercept the CH beams on both benches before they reach the dumps using 2 bricks (see attached picture).
Since the beam dumps are not yet watered, they were becoming too hot, because circa 3W are being dissipated on them. So we decided to intercept the CH beams on both benches before they reach the dumps using 2 bricks (see attached picture).
Alessio- Posts : 127
Join date : 2008-11-07
Age : 52
Location : Rome
Similar topics
» NI CH Partial installation
» WI CO2 camera re-installation
» Thermal cameras installation
» CO2 laser intensity stabilization installation
» Thermal camera installation on NI TCS bench and alignment checks
» WI CO2 camera re-installation
» Thermal cameras installation
» CO2 laser intensity stabilization installation
» Thermal camera installation on NI TCS bench and alignment checks
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|